TR10 Analysis
With the TR10 analysis in rotorsoft, you can determine the availability according to TR10 and a extrapolation of the site yield for the current 5-year cycle and also a statement on possible adjustments to the basic commission.
For wind turbines constructed from 2018 onwards, verification must be provided after 5 years that the site yield assumed at the time of approval corresponds to reality. The site yield is the yield calculated by an expert, which the plant generates at this location after 5 years and is used to determine the basic commission. If it turns out that the value is not correct, the commission may also be adjusted retroactively. It is therefore interesting to see before the 5 years expire whether and how the commission would be adjusted.